Hertford Road Basement Redevelopment

temporary works
basement
excavation

Service:

Temporary Works

Location:

London

Partners:

JMS Engineers

PROJECT OVERVIEW

Abacus Contractors Design Services engaged to provide temporary works design for excavation support on the redevelopment of 87–95 Hertford Road, known locally as the ‘Boris Building’.


Working alongside JMS Engineers, who are leading the structural design, our role focused on enabling safe and compliant basement construction beneath the existing structure.


We delivered a tailored temporary works scheme to support secant piled retaining walls during full basement excavation, ensuring stability in challenging ground conditions with minimal de-watering requirements. Our designs were coordinated with the permanent reinforced concrete substructure, allowing works to progress without disruption.


Abacus CDS’s support played a key role in ensuring excavation safety and structural integrity throughout this complex heritage redevelopment.

Hertford Road Basement Redevelopment

OUR SERVICES

Safe, Compliant, and Cost-effective Integrated Design Solutions

High rise residential building of flats with cladding being replaced with fire resistant m

Structural analysis and safety of building façades

Extensive scaffolding providing platforms for work in progress on a new apartment block UK

Safe and efficient temporary structures such as; scaffolding and shoring

(English) (34) (1).png

Reduce unnecessary costs, improve buildability, and deliver efficient structural designs

Aerial view of construction site with cranes, foundations and building materials. Resident

Embed our structural engineers within your design-and-build team from day one for seamless construction

Get in touch for to discuss your project with our engineering team

Compliant, cost-effective engineering and integrated design solutions for your construction projects. Contact Abacus Contractors Design Services today to discuss your project requirements.