Abacus CDS engaged to deliver temporary works design for excavation support during the construction of a new four-storey Mikvah facility in the London Borough of Haringey. Supporting JMS Engineers - who led the civil and structural design - our role focused on ensuring safe excavation to form the building’s basement.


We provided a tailored temporary works solution to support the unpropped contiguous piled retaining wall system during the excavation phase. Our design ensured site safety, ground stability, and compatibility with the permanent works strategy.


Working closely with the project team, we developed sequencing guidance and technical design outputs that allowed excavation to proceed efficiently, with minimal risk and full compliance with industry standards.

London Basement Excavation

OUR SERVICES

Safe, Compliant, and Cost-effective Integrated Design Solutions

High rise residential building of flats with cladding being replaced with fire resistant m

Structural analysis and safety of building façades

Extensive scaffolding providing platforms for work in progress on a new apartment block UK

Safe and efficient temporary structures such as; scaffolding and shoring

(English) (34) (1).png

Reduce unnecessary costs, improve buildability, and deliver efficient structural designs

Aerial view of construction site with cranes, foundations and building materials. Resident

Embed our structural engineers within your design-and-build team from day one for seamless construction

Get in touch for to discuss your project with our engineering team

Compliant, cost-effective engineering and integrated design solutions for your construction projects. Contact Abacus Contractors Design Services today to discuss your project requirements.

bottom of page